How to conduct Cost-Benefit Analysis
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Hamzeh Saqer on
I just need to know how to conduct the cost-benefit analysis (step 6) for a PV array on-site owned by a third party.
Modeling DOA in Baseline for residential project
NC-v4 EAp2:Minimum energy performanceposted by Saif Abdulameer on
I am working on a small hotel that is served by VRF units and DOA unit which dehumidify and reheat the OA for the guest rooms, when creating the Baseline system (system 2 for this project) should i
LEED ID+C CI commercial Interiors v4 water calc credit
CI-v4 WEc1:Indoor water use reductionposted by Robert Fernandez on
A little confused on this aspect of the credit....I was told buy a colleague that this credit can only apply to newly installed fixtures? and not base building restrooms that were not modified?
Option 2 site area
CS-v4 SSc2:Site development - protect or restore habitatposted by Gail Napell on
Hi all
just confirming this is literally based on site area -i.e. our site is very small, so the cost is proportional. Thank you!
Distance between bicycle racks and functional/main entry
Warehouses-NC-v4 LTc6:Bicycle facilitiesposted by Agnieszka Rylska on
This credit requires provision of bicycle racks within 30m of any main/functional entry.
MR - Construction and Demolition waste Management: Group Approach
NC-v4 MRc5:Construction and demolition waste managementposted by MAUDE PINTAL on
We have a certified LEED-NCv4 project located on a site pursuing a LEED-ND certification.
Lighting Quality - Task Lamps
NC-v4 EQc6:Interior lightingposted by Alessia Giannini on
Can project teams be awarded a point under the Lighting Quality, option 1 credit by providing task lamps with dimming capabilities to all of its employees through a request sys
Credit for minimizing hardscape
NC-v4 SSc5:Heat island reductionposted by Bret Mantyk on
Is there anyway to claim credit for having a lot of vegetated landscapes on a project - which meets the intent of reducing heat islands?
Building reuse, as part of a larger project.
NC-v4 MRc1:Building life-cycle impact reductionposted by Erica Downs on
Our project is reusing a non-historic, un-abandoned building, as part of a much larger project.
EPD Verifications: External vs Independent
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Mike Noon on
Hello,