Forum quick links
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Sound Isolation for Regularly Occupied space next to an Electrical room
NC-v4 EQc9:Acoustic performanceposted by Jill Kurtz on
If I have an conference room (occupied area) next to an electrical room, do I...
The fan power consumption calculation of PSZ-HP system
Retail-CI-v4 EAp2:Minimum energy performanceposted by JAMES CHEN on
questions:
1. Our current total area of the model: Total Building Area: 191.5 m2, Net Conditioned Building Area: 141.90, Unconditioned Building Area: 49.60m2, 2 Floor
Fenestration - Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have 3 questions to ask:
1.
Documentation for Material Reuse?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Megan White on
What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.
How to conduct Cost-Benefit Analysis
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Hamzeh Saqer on
I just need to know how to conduct the cost-benefit analysis (step 6) for a PV array on-site owned by a third party.
Modeling DOA in Baseline for residential project
NC-v4 EAp2:Minimum energy performanceposted by Saif Abdulameer on
I am working on a small hotel that is served by VRF units and DOA unit which dehumidify and reheat the OA for the guest rooms, when creating the Baseline system (system 2 for this project) should i
LEED ID+C CI commercial Interiors v4 water calc credit
CI-v4 WEc1:Indoor water use reductionposted by Robert Fernandez on
A little confused on this aspect of the credit....I was told buy a colleague that this credit can only apply to newly installed fixtures? and not base building restrooms that were not modified?