Forum quick links
Will "Overhead vegetated canopy" to be included in calculation for 25% minimum outdoor space?
NC-v4 SSc3:Open spaceposted by Qian P on
To satisfy SSc3 open space requirement, "A minimum of 25% of that outdoor space must be vegetated (turf grass does not count as vegetation) or have overhead vegetated canopy."
Bike Racks Joint To Facility
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Cora Kenrick on
Hi Fellow LEED Users,
Individual Occupant Space - Task Lighting
NC-v4 EQc6:Interior lightingposted by Daniel Thien on
I've seen several questions on this forum that address task lighting, but I still am a bit confused.
What is the difference between extraction point and manufactured point?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Carrie Willis on
Is manufactured point where we actually make the casegoods in our plant? Or is it where the panels are made from the extracted raw material?
HVAC Fans Schedules
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
I am working on a residential project served by VRF system. The fresh air stream is mixing with the return air before each space's FCU.
HVAC Fans Schedules
NC-v4 EAc2:Optimize energy performanceposted by Ahmed Labeeb on
Dear,
I am working on a residential project served by VRF system. The fresh air stream is mixing with the return air before each space's FCU.
Exceptional Calculation - Baseline Building
NC-v4 EAc2:Optimize energy performanceposted by SAMY Chamy on
Dear All:-
no parking
NC-v4 LTc7:Reduced parking footprintposted by Emmanuel Pauwels on
If the project does not provide any parking, can the credit be obtained?
Alternative ASE Calculation - Direct sunlight based on lux differences between adjacent grid points
NC-v4 EQc7:Daylightposted by Adam Kyle on
Hello!
Option 2. Prescriptive Compliance
CI-v4 EAp2:Minimum energy performanceposted by Sustainability Provider on
We are pursuing for LEED v4 certification for an office space under CI category.