New to LEED...Cheat sheet?
NC-v4 MPR1:Must be in a permanent location on existing landposted by Cora Kenrick on
Hi Ladies & Gentlemen,
I'm new to LEED and VERY new to submission...I will be completing my first submission soon.
Option 2 ASHRAE 50% AEDG - Equipment type not listed
NC-v4 EAp2:Minimum energy performanceposted by Megan Gilman on
I have a project in Climate Zone 6, which is trying to use Option 2 under the prescriptive path, using the 50% AEDG for Small to Medium Office Buildings. They'd like to avoid the ASHRAE 90.1
Can the APPA Audit be modified for hotel spaces?
EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessmentposted by Ana Hagerup on
The percentage of APPA Space Categories (i.e. break room, conference room, copy/mail room, etc.) are specific to office buildings.
Reclaimed water use
NC-v4 WEc1:Outdoor water use reductionposted by Ann Runley Carroll on
If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?
Additional Baseline System for pre-cooled spaces
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone
Brick and rubble in soil
NC-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.
Brick and rubble in soil
CS-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 Core & Shell project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.
use open space outside of project area
Healthcare-v4 SSc3:Open spaceposted by Lene Hill on
We have a project (building and parking lot) being built in a small master planned community. The community has several open spaces natural areas adjacent to the project with walking trails.&
Greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by Lene Hill on
The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it. This is where the new site is going.
One EPD for Multiple Products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Adam Yarnell on
Hi LEEDuser Experts!