Water Coil Sizing, heating and cooling

NC-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating

 

4
Thu Mar 8, 2018, 2:50 pm
7
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Mar 8, 2018, 2:29 pm

Post occupancy assesment

NC-v4 EQc4:Indoor air quality assessment
posted by  eran ben kennaz  on 

I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?

3
Thu Mar 8, 2018, 2:29 pm
5
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Thu Mar 8, 2018, 1:15 pm

Eligibility - roof areas in the calculations of restored area and activated area

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Ricardo Sá  on 

Dear All,

We are currently working in a project of a retail building with the following characteristics:

0

CHANGING FIXTURES IN THE CONSTRUCTION PHASE

CS-v4 WEp2:Indoor water use reduction
posted by  Belén Valladares López  on 

Hi everybody

We are in the construction phase of a project and the design phase has been already reviewed by USGBC

2
Wed Mar 7, 2018, 6:01 pm

Dual Car Chargers

NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

The reference manual narrative is looking for charging stations "in" 2% of all parking spaces and the online form is definitely looking for a number of spaces being served by charging stations.

1
Wed Mar 7, 2018, 8:54 pm

Biobased materials - Manufacturer declared conformance

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Danna Richey  on 

We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials.  Since we're unable to find any

0

Densely occupied spaces calculation

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Mike D  on 

If a space is smaller than 100 square feet, can it also be classified as densely occupied? We have many meeting rooms which are smaller than 100 square feet but that have high expected occupancy.

1
Wed Mar 7, 2018, 2:04 pm

Sensor Faucets

NC-v4 WEp2:Indoor water use reduction
posted by  Jennifer Rennick  on 

In prior versions of LEED, sensor faucets were given a credit for reducing hand washing duration from 15 seconds to 12 seconds.

5
Default Avatar
Principal
In Balance Green Consulting
LEEDuser Premium Member
0 thumbs up
Tue Mar 6, 2018, 9:31 pm