Waste Valet - Qualified Waste Management Credit?

NC-v4 MRp1:Storage and collection of recyclables
posted by  Anna Robinson  on 

I have a vendor who is telling me that waste valet service (picking up trash door-to-door) qualifies as a LEED credit. Is this the case?

1
Tue Mar 6, 2018, 7:36 pm

Differences of Glazing Factor and Daylight factor

NC-v4 EQc7:Daylight
posted by  Matouleibi Chingsubam  on 

Dear Leed Support, 

I was doing daylight calculation using glazing factor formulae. I would like to know how to get Window Geometry Factor and window height factor. 

1
Tue Mar 6, 2018, 7:56 pm

Historical Building

NC-v4 LTc3:High priority site
posted by  Luisa Tonelli  on 

Is there a year before which a building can be consider historic for USGBC?

1
Fri Mar 2, 2018, 5:51 pm

LEED v4 ID&C EAp2 Baseline Envelope

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Christopher Jones  on 

I am somewhat confused by the Minimum Energy Performance Calculator, Opaque Assemblies sheet: "All baseline existing roofs, above-grace exterior walls, below-grade exterior walls, exposed floors, s

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 28, 2018, 11:22 am

Food grade plastic within grocery installation?

Retail-CI-v4 EQc2:Low emitting materials
posted by  Jared Silliker  on 

I'm working on a grocery project that includes custom installations (oddly falls under furniture, I guess) that require food-safe surfaces.

1
Tue Mar 6, 2018, 7:27 pm

Open-Loop Heat Pump System/Process Water Use

NC-v4 WEp2:Indoor water use reduction
posted by  Kara Rousselle  on 

Can an open-loop ground source supply/injection well heat pump system be used for the heating and cooling system on a LEED v4 project?  Does the WE Prerequisite: Indoor Wat

3
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Tue Feb 27, 2018, 7:00 pm

Automatic lighting control in student rooms

NC-v4 EAp2:Minimum energy performance
posted by  Craig Flandermeyer  on 

How does ASHRAE 90.1-1010 apply to a university residence hall student room?  In the past, we have not included automatic control due to potentially different activity patterns of the 2 room o

6
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Tue Feb 27, 2018, 3:24 pm

Tables for base ratios based on GFA?

CS-v4 LTc7:Reduced parking footprint
posted by  Jens Apel  on 

There seems to be no reference which area is the basis for the calculations of the baseline parking capacity. I assume it is based on gross floor area. Is this correct?

1
Tue Feb 27, 2018, 9:38 pm

Option 2 Lighting Quality- Part E - LRV

NC-v4 EQc6:Interior lighting
posted by  Muge Karasahin  on 

Hello,

We are pursuing strategy E for lighting quality. We received a carpet spec which includes two LRVs: 

LRV – L value: 50.4

LRV - Y value: 18.8 

2
High Performance Specialist
EHDD
LEEDuser Basic Member
16 thumbs up
Tue Feb 27, 2018, 12:33 am

Measurement Option

CS-v4 EQc4:Daylight
posted by  Brightworks Sustainability  on 

Is it possible to do the measurement option for a core and shell project where the tenant is occupying 100% of the space?

1
Tue Mar 6, 2018, 6:50 pm