Enhanced Commissioning with a DES
NC-v4 EAc1:Enhanced commissioningposted by Deborah Lucking on
All - looking for clarification to this para from the v4 BD+C Reference Manual (page 401):
Not sure what we can do with this credit
EBOM-v4 SSc6:Site improvement planposted by Meier Corporate Account on
Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.
Occupancy Density and Fresh Air Calculation
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
Date of C2C certificate
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Charline SEYTIER on
The C2C certificates are ussually valid for 1.5 or 2 years, some will come to an end before the end of the project and maybe before the products are purchased.
Addenda item from 1/5/2018 - Required Documentation table
NC-v4 EAc5:Renewable energy productionposted by Erica Downs on
Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense. It is regarding the Required Documentation table, page 439 in the RG
Option 1 & 2
NC-v4 EQc6:Interior lightingposted by Christine Chow on
Are existing light fixtures required to be included in the calculations for both options?
Option 1 - "at least three lighting levels"
NC-v4 EQc6:Interior lightingposted by Megan Leslie on
Hi,
Accra Certified Contactors
Homes-v4 EAc4:Active Solar-Ready Designposted by Filemon Kapuno on
The project is situated in southeast asia and there is no Acca certified contractor. Does it mean we will not get the credit? But we have PCab (certification for contractors) will they accept?
90 % of windows should be shaded
Homes-v4 EAc6:Building orientation for passive solarposted by Filemon Kapuno on
Will I get the credit if I use Pella Windows with Built-in Window Blinds? It shades the opening on the summer solstice and can be open on winter solstice.
minimum parking spaces required by code vs. the 40% reduction from based ratio
NC-v4 LTc7:Reduced parking footprintposted by Penny ROJ on
I don't understand when we calculated the minimum parking spaces required by code , for example 50, and the 40% reduction from based ratio is 45, how can we provide the parking spaces less tha