Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Date of C2C certificate

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Charline SEYTIER  on 

The C2C certificates are ussually valid for 1.5 or 2 years, some will come to an end before the end of the project and maybe before the products are purchased.

3
Jr. Sustainable Building Advisor
Perkins+Will
LEEDuser Basic Member
8 thumbs up
Wed Feb 7, 2018, 12:03 am

Addenda item from 1/5/2018 - Required Documentation table

NC-v4 EAc5:Renewable energy production
posted by  Erica Downs  on 

Hello - I was reviewing the Reference Guide addenda items, and there is one for this credit that just does not make sense.  It is regarding the Required Documentation table, page 439 in the RG

1
Fri Feb 9, 2018, 6:17 pm

Option 1 & 2

NC-v4 EQc6:Interior lighting
posted by  Christine Chow  on 

Are existing light fixtures required to be included in the calculations for both options?

1
Thu Feb 15, 2018, 5:53 pm
1
Mon Feb 5, 2018, 9:19 pm

Accra Certified Contactors

Homes-v4 EAc4:Active Solar-Ready Design
posted by  Filemon Kapuno  on 

The project is situated in southeast asia and there is no Acca certified contractor. Does it mean we will not get the credit? But we have PCab (certification for contractors) will they accept?

1
Tue Jan 22, 2019, 1:12 am

90 % of windows should be shaded

Homes-v4 EAc6:Building orientation for passive solar
posted by  Filemon Kapuno  on 

Will I get the credit if I use Pella Windows with Built-in Window Blinds? It shades the opening on the summer solstice and can be open on winter solstice.

1
Tue Jan 22, 2019, 5:15 am

minimum parking spaces required by code vs. the 40% reduction from based ratio

NC-v4 LTc7:Reduced parking footprint
posted by  Penny ROJ  on 

I don't understand when we calculated the minimum parking spaces required by code , for example 50, and the 40% reduction from based ratio is 45, how can we provide the parking spaces less tha

1
Mon Oct 1, 2018, 9:06 pm

Controllability in Gallery/Exhibition spaces

NC-v4 EQc6:Interior lighting
posted by  Elizabeth Powers  on 

Does anyone have experience or insight into achieving this credit in gallery or exhibition spaces?

3
Mon Feb 5, 2018, 5:06 am

Option 2 Lighting Quality - Part E

NC-v4 EQc6:Interior lighting
posted by  Jeff Schwane  on 

We are trying to specify ceilings with at least 85% surface reflectance. However, there are areas with metal ceilings that have perforations for acoustical and fire requirements.

3
High Performance Specialist
EHDD
LEEDuser Basic Member
16 thumbs up
Mon Feb 5, 2018, 4:55 am

CIv4 op1:Modeling

CI-v4 EAp2:Minimum energy performance
posted by  Juan Carlos Sanabria Fallas  on 

Hi, I have some questions about the modeling system on CI.
1.If I have a curtain wall window on the exterior of my building, I still need to use U-value of the faming system?

3
Fri Feb 2, 2018, 10:50 pm