Forum quick links
How wide is the definition of coating?
CI-v4 EQc2:Low emitting materialsposted by Rita Paulo on
Hi everyone.
We are checking the project written material of a LEED V.4. BD+C project in Copenhagen.
Documentation
Healthcare-v4 IPp1:Integrated project planning and designposted by Tarik Tadmori on
O.k.
So we just held our workshop for a project.
How is this documented at the design submission stage?
Report of topics covererd and key actions/ownership?
Applying Facility Averages to Commingled Streams
NC-v4 MRc5:Construction and demolition waste managementposted by Ben Austin on
The following are the waste streams that are being collected on the project site:
- Wood
- Metal
Schools: Shop-applied primers
Schools-NC-v4 EQc2:Low emitting materialsposted by Philip Kabza on
Previous restrictions on content of shop-applied primers (such as on structural steel), that were put on hold in v3, appear to not have carried forward at all in v4. Am I correct?
Selling renewable energy
CI-v4 EAc4:Renewable energy productionposted by Borja Sánchez on
Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building.
Signed Tenant Lease Agreement
CS-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
The LEED Reference Guide states "If a project team wishes to pursue additional credits or thresholds beyond the construction scope of the LEED project, a binding tenant sales and lease agreement mu
Electric Forklifts Innovation Credit??
CS-v4 INc1:Innovationposted by Cora Kenrick on
Hello Fellow LEED Users,
I'm looking for advice.
FAR calculations
CS-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
University building - visitors/students
EBOM-v4 LTc1:Alternative transportationposted by Craig Flandermeyer on
For a university building where the majority of the students walk, is it realistic to project a 30-40% diversion rate? Is this a correct use of this credit intent?
NC Major renovation - Building Envelope Commissioning
NC-v4 EAc1:Enhanced commissioningposted by SAMY Chamy on
Dear Concern:-