Daylight in manufacturing project
NC-v4 EQc7:Daylightposted by Yodi Danusastro on
I'm assessing for daylight in an industrial project.
Energy Modelling - United Kingdom
NC-v4 EAp2:Minimum energy performanceposted by Fleur Baguley on
Hi, I have a project in the UK. For schemes such as BREEAM we use a SBEM - BRUKL output for the energy credits. Does anyone know if this is compliant to use for LEED as well?
Manual or automatic glare-control devices
NC-v4 EQc7:Daylightposted by Mugdha Mokashi on
Is it absolutely essential to have manual or glare-control devices in all of the regularly occupied spaces?
Calculation of Open space
NC-v4 SSc3:Open spaceposted by krishnan v on
I have a leed boundary of 100 acre out of which 40 acre is green field and 60 acre is previously developed.
Can an employee in LEED consultant firm who was not involved in the project be the CxA ?
CI-v4 EAc1:Enhanced commissioningposted by Vivian Szeto on
Hi, there.Can an employee of the LEED consultant firm who he/she is not a member of the design team be the CxA for both fundamental Cx and Enhanced CxA?
Site LEED Boundary
CS-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Project with only one parking space
NC-v4 LTc7:Reduced parking footprintposted by Ricardo Sá on
If a project has only one car parking space (and assuming that this number is wel below Parking Consulting Council recommendations for the project type) how can it comply with LTc7 (c
More Than One Commingled Waste Hauler on a Job - 2 Streams?
NC-v4 MRc5:Construction and demolition waste managementposted by Patty Lloyd on
Hi, if a project has a demolition subcontractor who hires a commingled waste hauler for some of the demolition debris, and then during the construction phase of the project the GC hires a commingle
remote access
NC-v4 EAc3:Advanced energy meteringposted by Antonio Macedo Filho on
I'd like to know if the BMS collecting the meter data would already meet the requirement of remote access to the data or this data should be avaiable for all ocupants.
Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?