Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?
Reviewers are not paying attention
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
Just got the review comments back on a project.
For Uplight, Option #1 was selected. BUG rating of fixtures was provided.
Residential Bicycle Storage Inside Unit
NC-v4 LTc6:Bicycle facilitiesposted by Kristen Magnuson on
Hello,
Community choice aggregation (CCA) programs?
NC-v4 EAc5:Renewable energy productionposted by Kristen Magnuson on
San Francisco's Public Utility Commission offers a currently-optional program called Clean Power SF. Electricity for the program is supplied by local renewable sources.
How Close for Cycles of Concentration
NC-v4 WEc3:Cooling tower water useposted by Nathan Gauthier on
The credit is pretty vague about defining the "maximum number of cycles without exceeding any filtration levels". Does this need to be exact (to the gallon over a year)?
Average Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Brendan Isard on
We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days. The credit language states that an average
MBCx Duration
CI-v4 EAc1:Enhanced commissioningposted by David Edenburn on
The LEED text only discusses what must be done in the first year. Is there any specific term that the MBCx must be done? In other Cx schemes they require two years, life of building, etc.
Recycling not provided for building
CI-v4 MRp1:Storage and collection of recyclablesposted by Katherine Roth on
Requirements state, "Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building." To meet the prerequi
Fundamental refrigerant management for a "District Energy System"
CI-v4 EAp3:Fundamental refrigerant managementposted by Ralph Bicknese on
To be clear, does the upstream equipment in a District Energy System need to be considered for the prerequisite or only for the enhanced refrigerant management credit? Based on the "project t
Tracking Waste for Commercial Interiors Project in a Building Still Under Construction
CI-v4 MRp2:Construction and demolition waste management planningposted by Loretta Maine on
Our LEED project is a Commercial Interior that is in a new building that is still under construction.