Forum quick links
NC-v4 SSc2 - Site development - protect or restore habitat
NC-v4 SSc2:Site development - protect or restore habitatposted by Mar Mulero on
Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a greenfield area or previously disturbed?
Monitoring-based commissioning
NC-v4 EAc1:Enhanced commissioningposted by Paula Rantanen on
In our project building, we have many measurement points that do not measure energy consumption directly but the energy consumption can be reliably calculated from the tracked data and the building
Which flow rates to use?
NC-v4 WEp2:Indoor water use reductionposted by Nate Tsang on
Hi all, The prerequisite lists the baseline flow rates at 60psi (415 kPa). Does this mean that the proposed flow rate must also be at 60psi?
Solid Untreated Wood Window Sills
NC-v4 EQc2:Low emitting materialsposted by Alara Brinton on
We have a project installing solid wood, (untreated) for the window sills & some baseboards.
Signage at Equipment Rooms with Exterior-Only Access
NC-v4 EQp2:Environmental tobacco smoke controlposted by Stephanie Graham on
My project is a fleet maintenance garage with storage. Per prerequisite requirements we are providing the no-smoking signage at all building openings including intakes, overhead doors and oth
Waste-to-Energy
NC-v4 MRc5:Construction and demolition waste managementposted by Lise Dannesboe on
Hi