10% annual building consumption VS 10% of electrical panel's power load
NC-v4 EAc3:Advanced energy meteringposted by Jake Buckmiller on
Hi all,
BUG Rating from similar IES file
NC-v4 SSc6:Light pollution reductionposted by Jake Buckmiller on
Hi all,
partial credit?
CI-v4 IPc1:Integrative processposted by Dana Piper on
If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?
Agricultural land as previously developed land.
ND-v4 SLLp1:Smart locationposted by Kaushaveer Ghoora on
Can we consider land under agricultural use (e.g. surgarcane cultivation) as previously developed land?
30% female 70% male for Police facility FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Lawrence Lile on
We are working on a police facility under LEED V4. Currently the department is 12% female. Nationally, police departments, according to a study we will cite, are 14% female. We ar
Material Reuse
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by SAMY Chamy on
Dear Concern:-
LEED - EBOM
EBOM-v4 MPR3:Must comply with project size requirementsposted by SAMY Chamy on
Dear Concern:-
Existing Data centre MPR Enquiry
LEED - EBOM Data center
EBOM-v4 MPR3:Must comply with project size requirementsposted by SAMY Chamy on
Dear Concern:-
Existing Data centre MPR Enquiry
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.
Performance check for each building in a district cooling system
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Nuttanee Vongveeranonchai on
Hi all,