CI-v4 IPc1:Integrative process
posted by  Dana Piper  on 

If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?

12
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Jan 8, 2018, 2:16 pm

Agricultural land as previously developed land.

ND-v4 SLLp1:Smart location
posted by  Kaushaveer Ghoora  on 

Can we consider land under agricultural use (e.g. surgarcane cultivation) as previously developed land?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Jan 8, 2018, 10:55 am

30% female 70% male for Police facility FTE

NC-v4 MPR3:Must comply with project size requirements
posted by  Lawrence Lile  on 

We are working on a police facility under LEED V4.  Currently the department is 12% female.  Nationally, police departments, according to a study we will cite, are 14% female.  We ar

3
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Sun Jan 7, 2018, 8:02 pm
2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Jan 6, 2018, 1:58 pm

LEED - EBOM

EBOM-v4 MPR3:Must comply with project size requirements
posted by  SAMY Chamy  on 

Dear Concern:-

 

Existing Data centre MPR Enquiry 

 

2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Jan 6, 2018, 1:57 pm

LEED - EBOM Data center

EBOM-v4 MPR3:Must comply with project size requirements
posted by  SAMY Chamy  on 

Dear Concern:-

 

Existing Data centre MPR Enquiry 

 

2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Jan 6, 2018, 1:55 pm

Elevators

NC-v4 EAc2:Optimize energy performance
posted by  John McCullough  on 

I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 5, 2018, 3:13 pm