Mon Apr 2, 2018, 4:24 pm

Substantial differences between the CGP from 2012 as required in LEED V4?

NC-v4 SSp1:Construction activity pollution prevention
posted by  veronica oyarzun  on 

Can anyone please tell me how different should be documenting this credit comparing with LEED 2009?

1
Thu Dec 21, 2017, 7:17 pm

Paired routes within walking distance

Healthcare-v4 LTc5:Access to quality transit
posted by  Donal Dignan  on 

There is a bus route I would like to count for this credit: the stop in one direction is within the 400 metre walking distance but the (paired) stop going the opposite direction is outside of the 4

0

EAc1 baseline and proposed systems

NC-v4 EAc2:Optimize energy performance
posted by  John McCullough  on 

The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the

1
Thu Dec 21, 2017, 4:14 pm

Innovation credits

NC-v4 INc1:Innovation
posted by  Manoj K S  on 

Do the strategies ( successful innovation credits) in Innovation database get upgraded to Pilot credits in future or they are project specific and open/closed type ?

1
Thu Dec 21, 2017, 4:37 pm

Water metering required for tenants?

CS-v4 WEc4:Water metering
posted by  Ricardo Sá  on 

A large office building is being certified using LEED Core & Shell.

 

0

Alternative Compliance Path Pilot Credit

NC-v4 INc1:Innovation
posted by  Paula Rantanen  on 

What is the difference between Alternative Compliance Path Pilot Credit (such as No Cooling Towers) and Pilot Credit?

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Thu Dec 21, 2017, 10:15 am

Design review of Innovation credits

CS-v4 INc1:Innovation
posted by  Michael Smithing  on 

LEED Online has only one form for all of the innovation credits in v4.  Does this mean that they must all be submitted together, or is it possible to submit the credit once in the design stage

1
Thu Dec 21, 2017, 2:51 pm

Preferred Parking (Carpool parking) Management Strategies for Stadium

NC-v4 LTc7:Reduced parking footprint
posted by  Quentin Jackson  on 

Are there different carpool/preferred parking strategies outlined by LEED for game days and non-game days? The stadium being constructed will attract 30,000 people on game days

1
Thu Dec 21, 2017, 6:49 pm

Innovation: Walkable project site

CI-v4 INc1:Innovation
posted by  Sabrina Cescolini  on 

Hello everyone,

Long-time LEEDuser user, first-time poster.