Forum quick links
O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
Retail -Clarifying Reference Guide language indicating "14 days"
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Stacey Olson on
The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.
Using Default Roof Material SRI values
NC-v4 SSc5:Heat island reductionposted by Lauren Sparandara on
Hello - I noticed that there are default SRI values available for use for the ground SRI values through CIR #10411 - just as was done for LEED 2009 - are there some default values that can be
NC-v4 MR
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Can anyone clarify the following section from p469 of the ref guide? It seems to be saying only include MEP materials that are credit compliant in calculations.
enhance indoor air quality strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by SAJJAD MALIK on
Dear All,
Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.
SDS for CASRN
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ralph Bicknese on
What type of feedback are people receiving from reviewers if trying to use the options to provide "A publicly available inventory of all ingredients identified by name and Chemical Abstract Service
Entryway systems excluded
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Jorge Lopez de Obeso on
Hello everyone, My project is a naturally ventilated office space that does not have any entrance close to the exterior; therefore, according to the Reference Guide, our project is excluded from t
Roller Window Shades
NC-v4 EQc2:Low emitting materialsposted by Christine Chow on
Are interior installed roller window shades included in the credit requirements?
Industrial park can be considered as the previously developed site?
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Vang Le Luong on
A new project in the industrial park, which was altered by agriculture use, can be achieved Option 1 of LTc4?
Thanks alot for your respond