Can the Projects Fundamental CxA be an employee of the Mechanical Design firm, but not part of MEP Design Team?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  marc myers  on 
  • The CxA may be a qualified employee of the owner, an independent consultant, or an employee of the design or construction firm who is not part of the project’s design or construction team, o
5
Fri Dec 15, 2017, 5:48 pm

brownfield confusion

NC-v4 LTc3:High priority site
posted by  Larry Sims  on 

Okay, I'll start this off by stating the requirement, and then asking a (simple) question. LEED v4 requirement: Locate on a brownfield where "soil or groundwater contamination has been identified"

6
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Fri Dec 15, 2017, 5:41 pm

How to Perform fundamental commisiioning and verification of VRF System?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  JASON NIEN  on 

we have a VRF(Variable Refrigerant Flow​) system for air conditioning . if we want to execute commissioning , how can i do this credit ? how to verify VRF system performance? thanks .

1
Fri Dec 15, 2017, 6:39 pm

Irrigation controller - WaterSense

NC-v4 WEp1:Outdoor water use reduction
posted by  Ricardo Sá  on 

Dear All,

Our project is located in Portugal and the project team is intendend to install a WaterSense irrigation controller.

1
Mon Jan 15, 2018, 10:39 pm

EPD Language

CS-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ward Miller  on 

Our project will be supplied bricks from Austria and potentially rebar from Turkey or Bosnia and Herzegovina.

1
Sat Mar 24, 2018, 8:24 pm

EAc6 form

NC-v4 EAc6:Enhanced refrigerant management
posted by  Jens Apel  on 

Does anyone have access to a working LEED Online template? My project is in precertification, forms not yet available.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Dec 15, 2017, 8:39 am

NC-v4 EQc1 - Enhanced indoor air quality strategies

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  SAJJAD MALIK  on 

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

1
Mon Jan 15, 2018, 9:53 pm

O+M Starter Kit for CI

CI-v4 INc1:Innovation
posted by  Kristen Magnuson  on 

Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.

1
Thu Dec 14, 2017, 10:59 pm

Retail -Clarifying Reference Guide language indicating "14 days"

Retail-CI-v4 EQc4:Indoor air quality assessment
posted by  Stacey Olson  on 

The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.

0