What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Walkable Project Site
NC-v4 INc1:Innovationposted by Quentin Jackson on
Hi all,
I'm working on a stadium project in Australia and we're looking at the walkable project site innovation credit.
Metering individual end uses >10%
NC-v4 EAc3:Advanced energy meteringposted by Carmen Mielecke on
Hello good morming, I would like to discuss the following example: If the simulation result on building level is, that the end use of lighting is >10% and the end use of user eq
Streams
NC-v4 MRc5:Construction and demolition waste managementposted by Charalampos Giannikopoulos on
In PR prerequisite it is required that 5 materials have been identified for diversion.
Does this count for LEED Credits?
NC-v4 MRc5:Construction and demolition waste managementposted by James Goldfield on
I am on a site where we have the option to chip the fallen tree's and stumps and sell that material to a power plant.
furniture made from laminated boards with A class according to French legislation
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
In our project we have plan to make individual furniture components from laminated boards on site.
Science behind maintaining internal temperature and relative humidity
NC-v4 EQc4:Indoor air quality assessmentposted by Dionisio Franca on
Hi.
LEED requires "maintaining an internal temperature of at least 60°F (15°C) and no higher than 80°F (27°C) and relative humidity no higher than 60%."
Credit Documentation Requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Is there a minimum requirement for supporting documentation for this credit in regards to uploading onto LEED Online?