Forum quick links
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
CS-v4: Only 1 water subsystem available to be metered, 2nd subsystem proposed to be metered in future. Is this acceptable?
CS-v4 WEc4:Water meteringposted by Mugdha Mokashi on
We are working on a core and shell project which currently has no indoor plumbing fixtures installed. So we have just one sub-system to meter (irrigation).
Innovation Credit Design for Active Occupants
NC-v4 INc1:Innovationposted by Philippa Cameron on
Hi.
Emission testing requirements for Solid wood
NC-v4 EQc2:Low emitting materialsposted by Jyothsna Giridhar on
Hello,
Shower Requirement- More than 50% Occupants with Bike Space
CI-v4 LTc4:Bicycle facilitiesposted by Oliver Bate on
Hi,
Can multiple teams of two in-house staff perform the audit?
EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessmentposted by Marc Mondor on
Our building contains a few million square feet, and while the APPA audit may be time consuming for a building of this size, we believe that it is worthwhile to pursue as part of our EBO
Rainwater Management GI
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
Is Exfiltration Trench/French Drains a Green Infrastructure Method?
Certifying 2 separate interior spaces in 2 separate buildings as 1 Certification
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Oliver Bate on
I have 1 CI project which is taking place in 2 adjacent buildings (Europe).
LEEDCoach Response to ITE questions
CI-v4 LTc5:Reduced parking footprintposted by emily reese moody on
Hi all,
I posed the following questions to LEEDCoach, and got the responses below.
Secure Facilities
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Logan on
Is it no longer a requirement to lock down parts of the building in order to meet this credit?