Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Rainwater Management through BMP

NC-v4 SSc4:Rainwater management
posted by  Jamé Wills  on 

I have an 8 acre site that is largely buildings and roadway, is it possible to achieve this credit with the use of French drain (exfiltration trenches)?

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Oct 12, 2017, 8:52 pm

Modular and Panelized construction

Mid-Rise-v4 MRc3:Construction waste management
posted by  Michael Browne  on 

How should recycled and total waste be calculated and documented for v4 LEED Homes Midrise projects with off-site construction such as panelized walls, trusses, and modular projects?

1
Tue Jan 22, 2019, 8:22 am
2
Thu Oct 12, 2017, 11:09 am
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 12, 2017, 5:59 am

Vacant Building - Minimal Occupants to Survey

EBOM-v4 LTc1:Alternative transportation
posted by  Levi Jimenez  on 

The MPR for minimum occupancy has been relinquished for LEED EB v4, so we are pursuing a building having only a couple of occupants, in a single tenant building that is currently between tenants.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Oct 11, 2017, 11:04 pm

shower flowrate

Homes-v4 WEc1:Total water use
posted by  Emmanuel Pauwels  on 

If multiple-head showers are installed in a single shower compartment, the reference guide states that we need to sum their flow rates and enter the result as one fixture.

1
Wed Oct 11, 2017, 3:33 pm

Habitable buildings

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Antonio Macedo Filho  on 

Hi, Eliot! 
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Oct 11, 2017, 2:23 pm

underfloor system supplying minimum outside air with radiant panel

NC-v4 EQc5:Thermal comfort
posted by  X. Chen  on 

Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.

1
Mon Dec 4, 2017, 4:40 pm