Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Outdoor air in the Baseline Model

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the s

3
Thu Apr 18, 2024, 4:22 pm

High Priority Site - Priority Destination for projects outside U.S.

CS-v4 LTc3:High priority site
posted by  Sajna Cherur Nathankoden  on 

Hi, 
What are the examples for Priority Destination for projects outside U.S.?

1
Fri Apr 19, 2024, 1:45 pm

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adrienne Franz  on 

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito

0

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4:Water metering
posted by  Cindy Quinn  on 

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

1
Wed Apr 17, 2024, 6:46 am

Number of eligible Innovation credits from Pilot Credits

NC-v4 INc1:Innovation
posted by  Jason Garvens  on 

Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? 

16
Tue Apr 16, 2024, 12:59 am

EAc2 Optimize Energy Performance: Baseline Building Heating Source

NC-v4 EAc2:Optimize energy performance
posted by  Ricardo Sá  on 
Hello. I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance: We’re currently involved in a project that is considering the use of biomass as heating source (space heating and dom
2
Tue Apr 16, 2024, 12:55 am

Wind PPA OR PV garden question

NC-v4 EAc5:Renewable energy production
posted by  Kyu-min Lee  on 

Hello,LEEDuser!!!!

My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 15, 2024, 8:28 pm

CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Olga Yuil  on 

For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.

0

can I get point with double contraction ??

NC-v4 EAc4:Demand response
posted by  Kyu-min Lee  on 

Hi,

 

While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as demand response.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 15, 2024, 5:40 pm

Bike storage distance

NC-v4 LTc6:Bicycle facilities
posted by  Pia Öhrling  on 

How do you calculate the distance if the bike storage is inside the building basement and you can bike to it after you have entered the door?

6
Mon Apr 15, 2024, 4:33 pm