Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
2
Thu Oct 12, 2017, 11:09 am
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 12, 2017, 5:59 am

Vacant Building - Minimal Occupants to Survey

EBOM-v4 LTc1:Alternative transportation
posted by  Levi Jimenez  on 

The MPR for minimum occupancy has been relinquished for LEED EB v4, so we are pursuing a building having only a couple of occupants, in a single tenant building that is currently between tenants.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Oct 11, 2017, 11:04 pm

shower flowrate

Homes-v4 WEc1:Total water use
posted by  Emmanuel Pauwels  on 

If multiple-head showers are installed in a single shower compartment, the reference guide states that we need to sum their flow rates and enter the result as one fixture.

1
Wed Oct 11, 2017, 3:33 pm

Habitable buildings

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Antonio Macedo Filho  on 

Hi, Eliot! 
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Oct 11, 2017, 2:23 pm

underfloor system supplying minimum outside air with radiant panel

NC-v4 EQc5:Thermal comfort
posted by  X. Chen  on 

Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.

1
Mon Dec 4, 2017, 4:40 pm

Option 3?

EBOM-v4 LTc1:Alternative transportation
posted by  Catalyst Partners  on 

Has anyone had experience with Option 3?  It appears we will not get any points in Option 2 - it's a fairly isolated building where everyone drives on their own.  

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 10, 2017, 8:12 pm

Option 3 - Core Performance Guide???

NC-v4 EAp2:Minimum energy performance
posted by  Erica Downs  on 

The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide".  However, this guide has been "sunset" by NBI and no longer exists.  Typic

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 10, 2017, 7:45 pm

Minimun size

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  NUBIA VALLES  on 

What is the minimum size for a LEED ND Project? I just found this about the maximum.

3
Tue Oct 10, 2017, 4:08 pm