Forum quick links
Requirement for mechanically-ventilated spaces and Water cooling systems in sheds
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Hanh Truong on
Dear all,
Hope you are doing well.
Use of Whole Building model to predict the energy consumption for each meter
NC-v4 EAc3:Advanced energy meteringposted by Lise Dannesboe on
Hi.
Hope some can help.
Vacant Building - Minimal Occupants to Survey
EBOM-v4 LTc1:Alternative transportationposted by Levi Jimenez on
The MPR for minimum occupancy has been relinquished for LEED EB v4, so we are pursuing a building having only a couple of occupants, in a single tenant building that is currently between tenants.
shower flowrate
Homes-v4 WEc1:Total water useposted by Emmanuel Pauwels on
If multiple-head showers are installed in a single shower compartment, the reference guide states that we need to sum their flow rates and enter the result as one fixture.
Habitable buildings
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Antonio Macedo Filho on
Hi, Eliot!
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?
underfloor system supplying minimum outside air with radiant panel
NC-v4 EQc5:Thermal comfortposted by X. Chen on
Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.
Option 3?
EBOM-v4 LTc1:Alternative transportationposted by Catalyst Partners on
Has anyone had experience with Option 3? It appears we will not get any points in Option 2 - it's a fairly isolated building where everyone drives on their own.
Option 3 - Core Performance Guide???
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide". However, this guide has been "sunset" by NBI and no longer exists. Typic
Minimun size
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by NUBIA VALLES on
What is the minimum size for a LEED ND Project? I just found this about the maximum.
Baseline Type and number of chillers
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Mena on
Hi,