Forum quick links
Project specific diversion vs facility average diversion
NC-v4 MRc5:Construction and demolition waste managementposted by Eesmyal Santos-Brault on
Under "Onsite separation vs.
5 materials versus 5 material waste streams
NC-v4 MRp1:Storage and collection of recyclablesposted by Susan Walter on
Page 479 in the RG states that you need to identify 'at least five materials...targeted for diversion.' On page 481 in Step 3, the 5th step says that you need to 'specify the means and methods of d
Material Description vs Material Type in the Calculator
NC-v4 MRc5:Construction and demolition waste managementposted by Agnieszka Rylska on
There are two separate columns in New Construction and Demolition Waste Management Calculator in .xls format: ‘Material Description’ and ‘Material Type’.
CI V4- Innovation: Green Vehicles
CI-v4 INc1:Innovationposted by Oliver Bate on
My project has 30% of carparking reserved for electric vehicles. The plugs used comply with an IEC standard but not the one specfied in the credit requirements.
Information on 10 years canopy
CS-v4 SSc5:Heat island reductionposted by Marianne Vajstedt on
Do you know where information can be found to determine the daimeter of trees after 10 years of planting? Our landscaping architect have only the information in maturity.
Project has shuttle to train station
NC-v4 LTc5:Access to quality transitposted by Lou Niles II on
The train station is just about 1mile from the projectHello I have a project in California with multiple shuttles that run short routes in the area of this NC building.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Casey Krieg on
Beginning to document the EDP's and such for this credit and in the resources tab under the credit I found the BPDO Calculator, which is an excel spreadsheet tool to help document and organize your
Manufacturer Take Back Programs
NC-v4 MRc5:Construction and demolition waste managementposted by Leanne Conrad on
I am looking for information on what type of backup documentation is required when we choose to use a manufacturer take back program as part of our recycling program.
LCA - existing party wall
NC-v4 MRc1:Building life-cycle impact reductionposted by Erin Holdenried on
Hi all -
building reuse counting as material reuse?
NC-v4 MRc1:Building life-cycle impact reductionposted by Jens Apel on
I am not quite sure on the definition of "material reuse".