New versions of AgBB - acceptable for showing compliance?

NC-v4 EQc2:Low emitting materials
posted by  Reinhard Oppl  on 

Hello, the credit allows non-US projects to accept products as low-emitting if these are compliant with AgBB (2010), even though the low formaldehyde requirement on top of AgBB compliance unfortuna

6
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Sep 13, 2017, 7:51 pm

No parking

CS-v4 LTc7:Reduced parking footprint
posted by  Mike D  on 

Can this credit be achieved if there are no parking spaces provided?

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed Sep 13, 2017, 5:12 pm

ASHRAE Level II Audit qualification

EBOM-v4 EAc1:Existing building commissioning—analysis
posted by  Alexa Stone  on 

Can an ASHRAE Level II Audit conducted in 2014 qualify for usage for this credit?

5
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Wed Sep 13, 2017, 4:44 pm

Definition of "modification"

CI-v4 EAp2:Minimum energy performance
posted by  Todd Tewksbury  on 

This question is regarding the Energy and Atmosphere prerequisite Minimum Energy Performance and associated credit Optimize Energy Performance under the LEED v4 Interior Design and Construction rat

3
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Wed Sep 13, 2017, 1:51 pm

Water Calculator

Mid-Rise-v4 WEc1:Total water use
posted by  Joan Kelsch  on 

Where can we find the total water use calculator?

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Tue Sep 12, 2017, 9:53 pm

University Dorm with Designated Parking

NC-v4 LTc7:Reduced parking footprint
posted by  Heather Zeto  on 

I am working on a project located on a University Campus.  The building usage/type is most closely related to a dormitory.

0

Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4?

NC-v4 MPR3:Must comply with project size requirements
posted by  Craig Wilson  on 

Is there a minimum % of  new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4? We are trying to decide between O+M and NC for a major renovation.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Sep 12, 2017, 3:52 pm
3
Architect, LEED AP BD+C
Livet Consulting
LEEDuser Basic Member
0 thumbs up
Tue Sep 12, 2017, 3:35 pm
1
Mon Sep 11, 2017, 7:07 pm

Thermal Comfort for Renovation of Historically Significant Building

NC-v4 EQc5:Thermal comfort
posted by  Heather Zeto  on 

Our project is a "Major Renovation" project for a historically significant buidling within a historic district.

1