Perimeter induction unit interpretation in 62.1 MZCal
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
A project is provided with perimeter induction units with internal coils for cooling and heating.
Baseline system type for project that will retain part of an existing HVAC system
NC-v4 EAp2:Minimum energy performanceposted by Camilo Velez on
Hi all,
Diesel Fuel Used for Sprinkler Water Pump House
Warehouses-NC-v4 EAp3:Building-level energy meteringposted by Laura Long on
Good day! We are working on a large warehouse facility that requires a large, 20' tall pump house to support a sprinkler system. It will run on diesel fuel. With this fuel ne
High Pressure Laminate Category in Low-Emitting Materials
CI-v4 EQc2:Low-emitting materialsposted by Diana Smiciklas on
Hello there,
Existing Project with New Addition
NC-v4 SSc6:Light pollution reductionposted by Michelle Rosenberger on
We are adding a Natatorium addition to an existing YMCA. In conjunction with this work, there will be new exterior lighting installed.
Map Software to Document Option 2 Diverse Uses
NC-v4 LTc4:Surrounding density and diverse usesposted by James Keohane on
I am looking for advice concerning map software used to most easily document location from project site and walking distance for each use. A mapquest screenshot for
is drywall not considered a product for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello Dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
An EPD report but not yet published
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Dina El-Sady on
Does the product have to be published on EPD directory to be accepetd by LEED ?Is it enough to submit an EPD report with internal audit ?
Monitoring NOT req if ventilation systems are not within scope of work?
CI-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
I'm wondering if my understanding of the ID+C reference manual (pg 311) is correct: no airflow monitoring equipment is needed if the ventilation system isn't in the scope of work?
Fresh Air Requirement for Lift Lobbies: Transfer Air Consideration
NC-v4 EQp1:Minimum indoor air quality performanceposted by Subhashkumar A on
Hello,