Forum quick links
Commissioning with Volume Build Projects
Retail-CI-v4 EAp1:Fundamental commissioning and verificationposted by Robin Dukelow on
I am in the process of verifying the Cx requirements for Volume Build Projects.
Lighting power density in tenants
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
According to LEEDv4 reference guide, tenants' lighting system must be modeled identically in the proposed building and in the baseline, as specified by Appendix G (unless energy savings are being c
Public lavatory and kitchen faucets
NC-v4 WEp2:Indoor water use reductionposted by Charalampos Giannikopoulos on
Are public lavatory and kitchen faucets excluded from the requirement to be WaterSense labelled?
Assessment report feedback?
NC-v4 SSc1:Site assessmentposted by Vince Briones on
Has anyone gotten formal review of this credit yet? Any feedback on the depth and detail of the assessment (and associated report) would be appreciated! Thanks,
Electric Vehicle Charging Point in the Green Lease Agreement
CS-v4 LTc8:Green vehiclesposted by Patrice McVeigh on
Hi All, I am working on a LEED v4 Core and Shell project which is proposing to install the infrastructure for the installation of an Electric Vehicle Charging Point.
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
What is acceptable for 10 years historical data-is it necessary to enter daily rainfall for 10 years-or can average monthly for each of the 10 years-enter annual?
Apartment flush-out
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Henderson on
I'm not an engineer or designer, but I have a question related to a new apartment I just moved in to. The building is new construction, and only the 4th floor (top floor) is completed.
Shuttle
EBOM-v4 LTc1:Alternative transportationposted by LEED Pro Consultant on
Are we able to use a shuttle run by building owner as an alternative transportation strategy? Thank you!