Ongoing Goods Accounting
EBOM-v4 MRc1:Purchasing - ongoingposted by Jordan Sager on
In the reference guide, the credit language says "Purchase at least 60%, by cost, of total ongoing consumables that meet at least one of the following criteria...: Postconsumer recycled content: mu
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?
Matting
EBOM-v4 EQp3:Green cleaning policyposted by Louise Taillon on
are there are any specifics as to what type or quality of matting that must be installed?
PV System on Campus Project
CS-v4 EAc5:Renewable energy productionposted by Annalise Reichert on
I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.
Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p
Parking Garage considered Exterior Fixtures?
EBOM-v4 SSc4:Light pollution reductionposted by Rachel Shepherd on
I am currently working on a project that has a covered, above ground parking garage within the site boundary. Are the fixtures within the parking garage considered interior or exterior fixtures?
O+M Starter Kit - Systems O+M Plan
NC-v4 INc1:Innovationposted by Kelsey Jensen on
Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Renewable sources area = calculation exception?
NC-v4 SSc3:Open spaceposted by Kristina Pobre on
Is the area for on-site renewable sources an exception to the calculation from the 30% site area?