Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Commissioning with Volume Build Projects

Retail-CI-v4 EAp1:Fundamental commissioning and verification
posted by  Robin Dukelow  on 

I am in the process of verifying the Cx requirements for Volume Build Projects.

0

Monitoring requirements - Naturally ventilated residential units

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Mario S.  on 

We are working on a residential building where split AC units are provided in every room for each unit with no mechanical ventilation.

1
Thu Aug 31, 2017, 1:00 am

Glass skylights and existing roof

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Hickerson  on 

I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.

1
Tue Aug 30, 2016, 7:32 pm

Rideshare Bike Rentals

NC-v4 LTc5:Access to quality transit
posted by  Samantha Varela  on 

Hi, My project is located within 1/4 mile (400 meter) walking distance of a Citi Bike Rental station that when at full capacity holds 14 bikes. Would this be considered ride share?

1
Mon Aug 28, 2017, 3:35 pm

Option 2. Connectivity

ND-Plan-v4 SLLc1:Preferred locations
posted by  Sarah Kearney  on 

I want to make sure I understand this correctly.

1
Tue Nov 29, 2016, 10:24 pm

NC-v4 SSc5: Site Assessment (Previously developed)

NC-v4 SSc1:Site assessment
posted by  Neshat Sakeena  on 

I am trying to populate the Site Assessment Worksheet. What does USGBC mean by "Human Views - View Corridors"? Any guidance on filling this template is welcome.

1
Wed Jul 8, 2015, 9:34 pm

Clarification on EVSE demand response requirements

NC-v4 LTc8:Green vehicles
posted by  Patrice McVeigh  on 

Can you please clarify two points regarding e-car demand response (DR) - 1. Are we correct in understanding that LEED considers building DR programs as separate from e-car DR programs? 2.

1
Fri Jun 22, 2018, 4:47 pm

CS Project with no ref equipment

CS-v4 EAc6:Enhanced refrigerant management
posted by  Martin Stowell  on 

I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen

1
Tue Jan 26, 2016, 5:53 pm

Certify only one floor among three floors that are rented

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Diana Nezamutinova  on 

Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac

1
Sat Aug 26, 2017, 6:01 pm