Interior Lighting Quality

NC-v4 EQc6:Interior lighting
posted by  April Wang  on 

Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.

1
Thu Jul 28, 2016, 8:16 pm

Lighting Levels

CI-v4 EQc6:Interior lighting
posted by  Kristopher Croghan  on 

For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?

1
Tue Sep 5, 2017, 10:11 pm

School outisde of project boundary

ND-Plan-v4 NPDc15:Neighborhood schools
posted by  Sarah Kearney  on 

The requirements do not specify if the school has to be within the project boundary.

1
Wed Nov 16, 2016, 10:33 pm

Low-Emitting Materials Calculator

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.

1
Mon Nov 3, 2014, 5:19 pm

Medical Equipment Specification

Healthcare-v4 WEp2:Indoor water use reduction
posted by  Gabriela Crespo  on 

Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.

0

BPDO Calculator / Total materials cost

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Kevin Wilcox  on 

Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Where does ‘Total materials cost’ number come from?

1
Mon Aug 7, 2017, 8:06 pm

DEMAND RESPONSE energy modeling

NC-v4 EAc2:Optimize energy performance
posted by   Habitech Distretto Tecnologico Trentino  on 

How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?

1
Tue May 27, 2014, 4:19 pm

Buildings w/ programmatic dependency/architectural cohesiveness

CS-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ricardo Sá  on 

I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer

1
Tue Jan 17, 2017, 8:09 pm

The year of metering

EBOM-v4 EAp2:Minimum energy performance
posted by  Vindio Corro  on 

Must be the year of metering after the registration of the project or can be used a year of metering of before?

1
Mon Jan 5, 2015, 7:59 pm

REACH

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Jonathan Weiss  on 

I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m

1
Tue Feb 21, 2017, 8:26 pm