Interior Lighting Quality
NC-v4 EQc6:Interior lightingposted by April Wang on
Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.
Lighting Levels
CI-v4 EQc6:Interior lightingposted by Kristopher Croghan on
For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?
School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Low-Emitting Materials Calculator
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.
BPDO Calculator / Total materials cost
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Wilcox on
Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Where does ‘Total materials cost’ number come from?
DEMAND RESPONSE energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Habitech Distretto Tecnologico Trentino on
How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
The year of metering
EBOM-v4 EAp2:Minimum energy performanceposted by Vindio Corro on
Must be the year of metering after the registration of the project or can be used a year of metering of before?
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m