Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Manufacturing process

NC-v4 EAp2:Minimum energy performance
posted by  ignacio furniés  on 

My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.

1
Tue Aug 9, 2016, 1:56 pm

Not Regularly occupied

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Phillip Cook  on 

In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.

1
Wed Aug 6, 2014, 4:10 pm

Products with Zero-VOCs disclosed by MFG

CI-v4 EQc2:Low emitting materials
posted by  Stacey Olson  on 

If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?

1
Tue Sep 5, 2017, 12:06 pm

Pressure flow rates

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

When introducing the design flow rate values in the indoor water calculator for option 1 calculated water use, we should use the flow rate fixtures values associated to the actual facility pressur

1
Tue Jun 27, 2017, 1:10 am

TVOC range for flooring?

NC-v4 EQc2:Low emitting materials
posted by  Tommy Linstroth  on 

I'm trying to figure out where you get the TVOC range for anything for flooring, namely Floorscore or CRI Green Label Plus?

1
Wed Feb 1, 2017, 8:39 am

right of ways adjacent to project?

ND-Plan-v4 NPDc7:Transit facilities
posted by  Ian Scott  on 

Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran

1
Mon Nov 30, 2015, 11:13 pm

Interior Lighting Quality

NC-v4 EQc6:Interior lighting
posted by  April Wang  on 

Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.

1
Thu Jul 28, 2016, 8:16 pm

Lighting Levels

CI-v4 EQc6:Interior lighting
posted by  Kristopher Croghan  on 

For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?

1
Tue Sep 5, 2017, 10:11 pm

School outisde of project boundary

ND-Plan-v4 NPDc15:Neighborhood schools
posted by  Sarah Kearney  on 

The requirements do not specify if the school has to be within the project boundary.

1
Wed Nov 16, 2016, 10:33 pm

Low-Emitting Materials Calculator

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.

1
Mon Nov 3, 2014, 5:19 pm