Forum quick links
Credit title and language do not match
Homes-v4 EAc4:Active Solar-Ready Designposted by Aaron McEwin on
The credit title and language do not match. Title is HVAC startup, language is in regards to PV.
Data Center in Portfolio Manager
Data-Centers-EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
Climate zones for windows
Homes-v4 EAc9:Windowsposted by Jimmy Maasen on
The LEED for windows description details different criteria for climate zones 1-8. However, I can't seem to find a climate zone map...where might I access this?
90.1-2007 G3.1.1 exception d vs 90.1-2010 exception c
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Exception c requires that lab spaces use a system 5 or 7 in the same way that exception d does, but exception c does not prescribe any specific turn down during unoccupied periods.
Free waste heat
CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
Structural Wood Components - Glulam
Schools-NC-v4 EQc2:Low emitting materialsposted by Kaeryn Gregory on
Is CARB testing now required (LEED v4) for structural framing wood components such as glulam?
Help with LEED ND
ND-v4 MPR1:Must be in a permanent location on existing landposted by T J on
Im a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including check
No irrigation for pre-req
NC-v4 WEp1:Outdoor water use reductionposted by Robyn Dowsey on
I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true
Off-site charging station
NC-v4 LTc8:Green vehiclesposted by Kristina Pobre on
Client is developing a ha land. We are applying certification for only a small part of it (about 2%). The LEED-project has its own parking and a % of it is for green vehicles.