Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Primer for Waterproofing membrane

NC-v4 EQc2:Low emitting materials
posted by  Leanne Conrad  on 

In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a

1
Mon Nov 7, 2016, 10:42 pm

Credit Points

Healthcare-v4 IPc1:Integrative process
posted by  Christine Chow  on 

The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?

1
Wed Aug 30, 2017, 2:17 pm

University Building - Weekend Trips

NC-v4 LTc5:Access to quality transit
posted by  Michelle DiPenti  on 

I have a question for a science building on a university campus. We want to earn a bonus point.

1
Mon Feb 2, 2015, 12:41 pm

Existing building - applicable requirements

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Ricardo Sá  on 

I'm working in a project of an existing building refurbishment that will pursue LEED certification CI.

1
Thu Sep 6, 2018, 8:44 pm

compliance with IS 7730:2005

NC-v4 EQc5:Thermal comfort
posted by  Angelina Ten  on 

Dear all, 1. Could you please tell me how did you get the values for radiant asymmetry of ceilings and walls, vertical air temp. difference and floor surface temperature for NC projects.

1
Wed Jun 24, 2015, 2:38 pm

Specialized transportation lighting

NC-v4 SSc6:Light pollution reduction
posted by  Vince Briones  on 

Hi all, Is "Specialized transportation signal, directional & marker lighting" subject to the interior lit exterior sign illuminance limits?

0

April 2017 addenda

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Nadav Malin  on 

With its April 2017 LEED Addenda USGBC continues to add to the list of certifications and declarations that qualify for Option 1—Material Ingredient Reporting of the 

0

Long-term bicycle storage, Bicycle maintenance program

Retail-CI-v4 LTc4:Bicycle facilities
posted by  Guillaume PAJOT  on 

Hi, I am working on a store located on the ground floor of a mall where the only space for long-term storage bicycle is a room located in the upper floor (accessible by the stairway with sufficien

1
Wed Jan 18, 2017, 12:52 am

Site adjacent to 5 lane highway - with no On-0ff ramp.

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Joyce Kelly  on 

If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo

1
Tue Jan 17, 2017, 9:25 pm

FSC calculations - weight or volume?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Julie Hardy  on 

Good afternoon everyone, We are wondering if the FSC contribution should be calculated, as in LEED 2009, by volume or weight for products.

1
Mon Aug 28, 2017, 2:38 pm