Forum quick links
Open Space vs. Vegetative Space
NC-v4 SSc3:Open spaceposted by Lorne Mlotek on
I just want to clarify what the difference is between Outdoor Space and Vegetative Space. In this credit we are looking at 30% of total site = Outdoor Space 25% of which (IE.
Additional Credit Rules
EBOM-v4 LTc1:Alternative transportationposted by Logan Cohen on
Is it important to know the entire calculation for the O+M Exam? Also, I'm reading the other comments and finding that there are rules about this credit not listed on this site.
Title 24 Equivalency?
NC-v4 EAp2:Minimum energy performanceposted by Renee Azerbegi on
Has USGBC issued any equivalency for Title 24 (vs ASHRAE 90.1) in LEEDv4 EA credits yet? I've seen comments saying it can take a while. Just wondering if it is on the horizon for LEEDv4 or not?
Conveying systems now accepted for this credit
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Green Vehicle permitting and parking enforcement
NC-v4 LTc8:Green vehiclesposted by Kristen Callori on
Page 128 of the v4 Reference Guide shows a picture of preferred parking signage that includes the words "Permit Required".
EQUIVALENCE WITH VERSION 2009
CI-v4 EQc7:Daylightposted by Gabriela Mena on
Hi, We have a CI project that is in a CS Platinum V3 building, the building achieved the IEQ C8.1 for the Core & Shell under Option 1.
Window coating and films
NC-v4 EQc2:Low emitting materialsposted by Edgar Arevalo on
Would window coating and films fall under Interior Paints and Coatings section for this credit, or do they not apply?
Brownfield remediation
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
62MZ Calculator for v4
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Rasita Masalskyte on
The prerequisite form states that 62MZ Calculator can be used as an alternative to Minimum Air Quality Performance Calculator and it can found under the prerequisite's Resources tab in the Credit L