Incineration Option for Diversion Method
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
1.Incineration may be considered "if reuse and recycling methods are not readily available"...........How will Reviewers define "readily available"? 2.
MBCx scope for LEED-CI
CI-v4 EAc1:Enhanced commissioningposted by Mark Benson on
The project scope includes new HVAC equipment & controls as well as occupancy sensors for lighting control.
LOW VOC Comply
CI-v4 EQc2:Low emitting materialsposted by Brigitte Solis W on
Hi, I am completing the VOC calculator, but if I put a product with the maximum allowed value it does not comply. For example if they ask for 70 and my product has 70 for v4 is not fulfilling?
Hot Humid, Multi Family Compliance
Mid-Rise-v4 EQp1:Ventilationposted by Jason Biondi on
Will direct kitchen exhaust be required for multi family, hot/humid, mid rise projects, pursuing the natural ventilation approach to compliance with IEQ Ventilation prereq.? Best regards Jason
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Minimum Energy Performance Data Center Calculator
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Hello everybody, For a data center project we have used the “Minimum Energy Performance Data Center Calculator” to claim saving from the IT load.
District Energy Treatment in LEEDv4
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Is there any new guidance or published changes for modeling district energy loops in LEED v4?
Public Garage
NC-v4 LTc8:Green vehiclesposted by Summer Gorder on
I am working on a public project downtown that does not have any designated parking.
Tenant Area Modeling
CS-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.
Clarifying 20 different materials from 5 different manufacturers
Schools-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Cynthia Kaplan on
As I interpret the language of this credit, can I assume that I can submit say, three different types of ceiling tile from one manufacturer, and this would count as three different materials?