Forum quick links
Walkable Street - Item D Functional Entries
ND-Plan-v4 NPDc1:Walkable streetsposted by Martine Desbois on
Hi Elliot, Our project team is uncertain about the wording of the Step-by-Step explanation for this item.
[Innovation Credit] Bicycle Alternative
Schools-EBOM-v4 INc1:Innovationposted by JOHN COOK on
Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.
Re-using existing building as outdoor amphitheater
NC-v4 MRc1:Building life-cycle impact reductionposted by Jeff Denno on
Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th
Reverberation Time in Very Lage Open Office Areas
NC-v4 EQc9:Acoustic performanceposted by Levan Natadze on
Hello, Cold you please provide a tip, how to achieve reverberation time 0.8 in very large open office areas. Good absorptive materials do mot work for so large spaces as 1,000 sq.
Data Center Energy Calculator Tool
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Jack Jenkins on
Does anybody have any experience with this new tool or know whether any further guidance on how it should be used is available? I have two questions in particular: 1) How is the baseline electrica
Utility Renewable Portfolio Credit
NC-v4 EAc7:Green power and carbon offsetsposted by Brent Tokita on
My local utility has independent certification of it's current renewable portfolio, can this be credited against the Green Power percentage? e.g.
Pending commissioning completion
NC-v4 EAp1:Fundamental commissioning and verificationposted by Charalampos Giannikopoulos on
Projects registered with LEED v3 had an option of indicating that commissioning report is pending completion and providing a contract to ensure that the report will be completed.
Lighting Zones
NC-v4 SSc6:Light pollution reductionposted by Linda Anderson on
Who determines the exterior lighting zone LZ0-LZ4 for a LEED project? I am working on a project in a state that isn't mine and I don't know much about the city.
TVOC range for flooring?
NC-v4 EQc2:Low emitting materialsposted by Tommy Linstroth on
I'm trying to figure out where you get the TVOC range for anything for flooring, namely Floorscore or CRI Green Label Plus?
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran