Forum quick links
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
Monitoring requirements - Naturally ventilated residential units
CS-v4 EQp1:Minimum indoor air quality performanceposted by Mario S. on
We are working on a residential building where split AC units are provided in every room for each unit with no mechanical ventilation.
Glass skylights and existing roof
NC-v4 SSc5:Heat island reductionposted by Jonathan Hickerson on
I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.
Rideshare Bike Rentals
NC-v4 LTc5:Access to quality transitposted by Samantha Varela on
Hi, My project is located within 1/4 mile (400 meter) walking distance of a Citi Bike Rental station that when at full capacity holds 14 bikes. Would this be considered ride share?
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
NC-v4 SSc5: Site Assessment (Previously developed)
NC-v4 SSc1:Site assessmentposted by Neshat Sakeena on
I am trying to populate the Site Assessment Worksheet. What does USGBC mean by "Human Views - View Corridors"? Any guidance on filling this template is welcome.
Clarification on EVSE demand response requirements
NC-v4 LTc8:Green vehiclesposted by Patrice McVeigh on
Can you please clarify two points regarding e-car demand response (DR) - 1. Are we correct in understanding that LEED considers building DR programs as separate from e-car DR programs? 2.
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
LEED EB O&M Certification - optimized energy performance
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by satheesh M on
I want to register a project in LEED EB. my project contains 3 buildings in a 8 building campus.