Forum quick links
Sharing Water Data
NC-v4 WEp2:Indoor water use reductionposted by Nathan Gauthier on
Has anybody actually shared their water data yet? My client is asking how to go about this. I guess same is true of energy.
Borrowed Daylight
NC-v4 EQc7:Daylightposted by Razan Nejem on
when demonstrating a daylight simulation, shall the interior glazed areas be excluded from the calculation because light traveled through multiple layers of glazing
Baseline HVAC system type
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Consumable Materials for Equipment
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by RYAN BEN SABILALA on
Just want to make sure if the consumable materials like oils, gaskets, O-rings etc.
Contact at USGBC regarding LEED ND
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Martine Desbois on
I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?
green roofs
NC-v4 WEp1:Outdoor water use reductionposted by Geoffrey Katz on
Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?
LEEDv4 Homes - Parking Structure
Homes-v4 MPR2:Must use reasonable LEED boundariesposted by Sara Greenwood on
It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl
Functional Entry for Addition Project
NC-v4 LTc5:Access to quality transitposted by Eric White on
Our project is a four storey addition to an existing four storey building.
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
Fundamental Refrigerant Management: Leed v4- Campus Credit
EBOM-v4 EAp4:Fundamental refrigerant managementposted by Patricia Andrasik on
We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.