Minimum Occupancy

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Gina Dederer  on 

So is the minimum FTE of (1) no longer required, specifically for unmanned, fully-automated warehouses or storage facilities?

1
Thu Apr 24, 2014, 3:18 pm

Akvifer

NC-v4 EAc5:Renewable energy production
posted by  Sara Johansson  on 

Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.

1
Thu Nov 10, 2016, 4:51 pm

Disincentivizing Parking Reductions

NC-v4 LTc7:Reduced parking footprint
posted by  Michelle Rosenberger  on 

Even given the fact that LEED does not want to encourage automobile use, it seems excessively onerous to me to require a project to meet a 40% reduction if it earns even 1pt in Density or Transit.

1
Thu Aug 31, 2017, 6:27 pm

Onsite solar PV generation - 10 years contract

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Ameet AA  on 

Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?

1
Tue Jun 27, 2017, 1:17 am

ID+C - EQ Credit Interior Lighting - Lighting Sales areas

Retail-CI-v4 EQc6:Interior lighting
posted by  Valentin Grimaud  on 

HI, I am working on a store with two lighting types: furniture lighting and ambiant lighting. Only a part of the ambiant lighting is controlled depending on daylight illumination (40%).

1
Wed Jan 18, 2017, 6:31 pm

Ferry Service - defined

Data-Centers-NC-v4 LTc5:Access to quality transit
posted by  Vada Kornegay  on 

I am doing a project on a college campus. Can someone confirm whether or not the campus bus system is or is not a "ferry service"?

1
Sat Aug 26, 2017, 11:13 am

PPA as renewable energy production?

CS-v4 EAc5:Renewable energy production
posted by  Lai-San wong  on 

Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.

1
Mon Aug 28, 2017, 1:41 pm

Midrise Site Credits as Master Site credits

Mid-Rise-v4 LTc2:Site selection
posted by  Jennifer Rennick  on 

I'm working on a project with multiple residential buildings in 4 types grouped on a 20 acre site. We'd like to use master site credits along with LEED Homes certification.

1
Tue Jan 22, 2019, 7:45 am

Zero lot line

EBOM-v4 SSc5:Site management
posted by  Lawrence Lile  on 

Can a zero lot line building achieve this credit?

1
Wed Mar 15, 2017, 9:36 pm