ND-Plan-v4 GIBc1:Certified green buildingsposted by soha yamani on
I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your neigh
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?
Selection of Leed certification
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by B B on
Could you recommend an appropriate leed certification for an existing Water Treatment Plant and state how would the use of renewable technology in attaining this rating system
Thermal Comfort
CS-v4 IPc1:Integrative processposted by Ciaran McCabe on
Has anyone any experience in terms of what a LEED reviewer might look for in terms of Thermal Comfort Ranges for this credit ?
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Ongoing Goods Accounting
EBOM-v4 MRc1:Purchasing - ongoingposted by Jordan Sager on
In the reference guide, the credit language says "Purchase at least 60%, by cost, of total ongoing consumables that meet at least one of the following criteria...: Postconsumer recycled content: mu
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?
Matting
EBOM-v4 EQp3:Green cleaning policyposted by Louise Taillon on
are there are any specifics as to what type or quality of matting that must be installed?
PV System on Campus Project
CS-v4 EAc5:Renewable energy productionposted by Annalise Reichert on
I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.