Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

MERV filters

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Gustavo De las Heras Izquierdo  on 

Is there any mandatory filter efficiency requirement (MERV) for projects located in areas with a very high PM2.5 levels? Is it mandatory for ASHRAE 62.1-2010 requirements?

1
Tue Jun 6, 2017, 12:18 am

Heat pump water heater

CS-v4 EAc6:Enhanced refrigerant management
posted by  Ammon Palmer  on 

We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.

1
Thu Jun 2, 2016, 10:43 pm

Reduced parking footprint for College/University

NC-v4 LTc7:Reduced parking footprint
posted by  Iris Amdur  on 

The project is a single building which is part of a larger educational campus.

1
Tue Aug 29, 2017, 10:04 pm

Building Eligibility + Project Boundary

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Julia Perez  on 

Hi  I have a bit of a particular project here, let me explain. We want to certify 5 office buildings under LEED v4 EBOM.

1
Tue Sep 6, 2016, 3:41 pm

Percentage below water consumption maximum

EBOM-v4 WEp1:Indoor water use reduction
posted by     on 

If the percentage below water consumption maximum is calculated to be -22% (not 0%) by using the calculator, is the pre-requisite met or not?

1
Mon Aug 28, 2017, 6:06 pm

Calculation

NC-v4 EAc7:Green power and carbon offsets
posted by  Vitor Tosetto   on 

Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.

1
Wed Nov 30, 2016, 3:01 pm

Combining LEV/FEV and Discounts

NC-v4 LTc8:Green vehicles
posted by  Brightworks Sustainability  on 

Has anyone heard of an alternative method for combining preferred parking for green vehicles and also providing a discount?

1
Fri Jun 16, 2017, 4:49 pm

storage of rain water

NC-v4 WEp1:Outdoor water use reduction
posted by  Francesco Passerini  on 

Does the storage of rain water contribute to achieve this prerequisite? The project will irrigate the outdoor vegetation only with rain water.

1
Fri Feb 19, 2016, 10:19 pm

EBOMv4 - Streamlined Path option

EBOM-v4 MPR1:Must be in a permanent location on existing land
posted by  Catalyst Partners  on 

EBOMv2009 had a streamlined path option for projects that had previously achieved BD+Cv2009 Certification. Does that still exist for EBOMv4?

1
Tue Jan 17, 2017, 9:01 pm

Preproject water bodies

ND-Plan-v4 SLLp3:Wetlands and water body conservation
posted by  Sarah Kearney  on 

Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.

1
Tue Feb 28, 2017, 5:16 pm