Healthcare-v4 INc2:LEED Accredited Professionalposted by Catherine Blakemore on
Can folks with Legacy LEED AP status be the LEED AP for projects and fulfill the requirements of this credit?
Mechanically conditioning and natural ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Can a mechanically conditioned space be naturally ventilated? I mean, is this combination allowed by ASHRAE 62.1-2010 and ASHRAE 55-2010?
IN: Green Building Education
EBOM-v4 INc1:Innovationposted by Alexa Stone on
One of the elements of this credit includes: The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project.
Construction and Demolition Waste Management - Credit Calculator
CI-v4 MRc6:Construction and demolition waste managementposted by Dipti Talwar on
1. While filling the details in the credit calculator, in the material stream column there is an option of Recycled – source separated. What does this mean?
Adsorption Heat Pump
Homes-v4 EAc10:Space heating and cooling equipmentposted by FABIO VIERO on
Hello everyone, in case of Gas Adsorption Heat Pump, which is the reference system we should consider for checking credit compliance? Thanks.
Different CxA for Construction other than one hired duringDesign
CS-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?
Commissioning of DATA Centers
Data-Centers-NC-v4 EAc1:Enhanced commissioningposted by Vassil Vassilev on
Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec
100' Distance on a Campus
NC-v4 LTc6:Bicycle facilitiesposted by Brightworks Sustainability on
Hi all, My project is part of a campus where the owner is building a garage along with our project.
Multiple Buildings
EBOM-v4 WEc2:Indoor water use reductionposted by Jonathan Miller on
How do we handle multiple buildings being submitted for LEED certification together as part of a campus?
Combined Density
NC-v4 LTc4:Surrounding density and diverse usesposted by Charalampos Giannikopoulos on
If a project follows Option 1 - combined density, would the project be still eligible even if there are no residential units within the 1/4 radius?