DES systems

CS-v4 EAc2:Optimize energy performance
posted by  Mike D  on 

If the building is connected to a DES system, do both the DES system as well as the building itself need to be modelled?

1
Tue Apr 14, 2015, 2:06 pm

Number of cycles

EBOM-v4 WEc3:Cooling tower water use
posted by  Jonathan Miller  on 

What is the number of cycles necessary to achieve 1 point? 10?

0

PV - how is it accounted for?

Mid-Rise-v4 EAp1:Minimum energy performance
posted by  sue bryant  on 

I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.

1
Tue Jan 17, 2017, 9:01 pm

Resuspension of particles from flooring?

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Roger Lewis  on 

Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?

1
Tue Jul 25, 2017, 11:11 pm

Soil Restauration in vegetated roof

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Ana García  on 

Dear All, We are working in a project, in which the whole site was previously developed and paved. All new green areas will be vegetated roofs (project achieves a density of 1.5 floor-area ratio).

1
Tue Jan 17, 2017, 4:41 pm

Steel Studs vs. Track

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Johanna Scogin  on 

Does the steel stud count as different material than the track?

1
Sat Aug 26, 2017, 1:31 pm

Elevated Airtrain station

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Judhajit Chakraborty  on 

How does this MPR impact elevated station projects?

1
Mon Jan 16, 2017, 2:27 am

Option 2- "Waste" reduction

NC-v4 MRc5:Construction and demolition waste management
posted by  Whitney Smith  on 

In option 2 of this credit, does the 2.5 pounds of "waste" mean 2.5 pounds of non diverted waste?

1
Tue May 31, 2016, 3:03 pm

Atrium with reception desk

CS-v4 EQc4:Daylight
posted by  Martin K  on 

Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.

0

Reverberation Time and BIG Open Area

NC-v4 EQc9:Acoustic performance
posted by  Avtua Kraveishvili  on 

If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?

0