CS-v4 EAc2:Optimize energy performanceposted by Mike D on
If the building is connected to a DES system, do both the DES system as well as the building itself need to be modelled?
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
PV - how is it accounted for?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by sue bryant on
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.
Resuspension of particles from flooring?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Roger Lewis on
Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?
Soil Restauration in vegetated roof
NC-v4 SSc2:Site development - protect or restore habitatposted by Ana García on
Dear All, We are working in a project, in which the whole site was previously developed and paved. All new green areas will be vegetated roofs (project achieves a density of 1.5 floor-area ratio).
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
Elevated Airtrain station
NC-v4 MPR1:Must be in a permanent location on existing landposted by Judhajit Chakraborty on
How does this MPR impact elevated station projects?
Option 2- "Waste" reduction
NC-v4 MRc5:Construction and demolition waste managementposted by Whitney Smith on
In option 2 of this credit, does the 2.5 pounds of "waste" mean 2.5 pounds of non diverted waste?
Atrium with reception desk
CS-v4 EQc4:Daylightposted by Martin K on
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.
Reverberation Time and BIG Open Area
NC-v4 EQc9:Acoustic performanceposted by Avtua Kraveishvili on
If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?