Forum quick links
just doing a survey is incentivized
EBOM-v4 LTc1:Alternative transportationposted by Tristan Roberts on
I wanted to note a key feature of this credit in v4, which was brought to my attention by Dan Ackerstein and Hannah Sokol.
LEEDv4- Schools, LTc6 Bicycle Facilities
NC-v4 LTc6:Bicycle facilitiesposted by Karly Michalowski on
I have a LEEDv4 for Schools project where all students, staff and facility live on campus. Would dormitory showers count towards this credit?
Which rating system to use
CI-v4 INc2:LEED Accredited Professionalposted by Pamela Smith on
Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%
NC-v4 WEc1:Outdoor water use reductionposted by Jing Zhang on
Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.
Budget Method
NC-v4 EQc2:Low emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Product Specific & Industry EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Leanne Conrad on
Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
BPDO Calculator Error
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michael Wahjudi on
Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.
Engaging the CxA
CI-v4 EAp1:Fundamental commissioning and verificationposted by Jeni Panars on
This pre-requisite requires the CxA be engaged by the design development phase. The client for the project I am working on did not decided to pursue certification until 100% design.
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a