just doing a survey is incentivized

EBOM-v4 LTc1:Alternative transportation
posted by  Tristan Roberts  on 

I wanted to note a key feature of this credit in v4, which was brought to my attention by Dan Ackerstein and Hannah Sokol.

0

LEEDv4- Schools, LTc6 Bicycle Facilities

NC-v4 LTc6:Bicycle facilities
posted by  Karly Michalowski  on 

I have a LEEDv4 for Schools project where all students, staff and facility live on campus. Would dormitory showers count towards this credit?

1
Thu Jun 8, 2017, 1:38 pm

Which rating system to use

CI-v4 INc2:LEED Accredited Professional
posted by  Pamela Smith   on 

Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?

1
Sat Aug 26, 2017, 6:17 pm

Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%

NC-v4 WEc1:Outdoor water use reduction
posted by  Jing Zhang  on 

Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.

1
Thu Oct 19, 2023, 1:36 am

Budget Method

NC-v4 EQc2:Low emitting materials
posted by  LUCY WILLIAMS  on 

We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.

1
Mon Aug 21, 2017, 1:25 pm

Product Specific & Industry EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Leanne Conrad  on 

Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.

1
Wed Jan 11, 2017, 7:09 pm

EAp2:Table 1.4 based on ASHRAE 90.1-2010

CS-v4 EAp2:Minimum energy performance
posted by  CHRISTOPHE MATHIEU  on 

Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard

1
Tue Apr 14, 2015, 1:47 pm

BPDO Calculator Error

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Michael Wahjudi  on 

Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.

1
Mon Dec 28, 2015, 2:36 pm

Engaging the CxA

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Jeni Panars  on 

This pre-requisite requires the CxA be engaged by the design development phase. The client for the project I am working on did not decided to pursue certification until 100% design.

1
Fri Apr 14, 2017, 9:04 pm

EPDM tile and Wood Porch

Schools-NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a

1