Forum quick links
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Antje Holdefleiss on
Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Alternative Path for the Optimize Energry Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
We are a brand new dairy located in Ohio. We were constructed in 2014 and went online in 2015. In 2014 there were only 3 new dairies built.
Lighting Power Density at Data Halls
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Anthea Ng on
Hello, May I seek anyone's advice on how to determine the lighting power density for data hall while there is no criteria in ASHRAE 90.1? I have ever heard of 0.8 W/ sf (treating similar to activ
material streams
CI-v4 MRc6:Construction and demolition waste managementposted by Sean Quinn on
We are working on a project where there is not enough room for on-site separation, and the commingled waste will be picked up by the sorting facility.
Reporting and metering frequency
NC-v4 WEc4:Water meteringposted by Lorne Mlotek on
In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi
Is there a timeframe for the minimum number of cycles?
NC-v4 WEc3:Cooling tower water useposted by Gregory Martin on
I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements.
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Tab 6-1 and 6-4
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?
Minimum Unloading Ratio for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
For chillers in EnergyPlus I have to provide the data “Minimum Unloading Ratio”.