Forum quick links
Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Is there a limit to how many products can use the same CSR?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Alexa Stone on
An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Errors in Outdoor Water Use Reduction Calculator
EBOM-v4 WEc1:Outdoor water use reductionposted by Stephanie Donovan on
I noticed the worksheet has some errors: a) "Baseline Calculation" tab: the Watering Demand column is subtracting rainfall from ETo, instead of ETo being subtracted from rainfall b) "Baseline Cal
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Approved Deicers
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hi Sam, I've been looking at deicers appropriate for this credit.
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
Measurement & Verification
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Has the credit criteria for Base Build M&V been removed from V4 Core & Shell or has it been built into another credit ?
Dry cooling tower
NC-v4 WEc3:Cooling tower water useposted by Sara Johansson on
Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?