Forum quick links
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Project with no associated off-street parking
NC-v4 LTc8:Green vehiclesposted by Miriam Ramirez Baumgarten on
Hi! Could a project with no associated off-street parking achieve credit compliance by installing electrical vehicle supply equipment (EVSE) in a taxi station near the project and having signage i
Outdoor water use reduction LWR values
NC-v4 WEp1:Outdoor water use reductionposted by Vasileios Kalfountzos on
Hello everyone, I am currently filling in the documents for this particular credit and I get a negative value for LWR.
Multi-attribute optimization
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Tobias Berge on
Object - LEED v 4 Core & Shell. Sweden. Our goal is Platinum and we find the material credits very challenging.
Fast charge
NC-v4 LTc8:Green vehiclesposted by Dionisio Franca on
On LEED 2009, I remember reading that using a charger that could half the charge time would be counted as 2 charge stations. Did this change for LEED v4?
EBOM V4 School
Schools-EBOM-v4 SSp1:Site management policyposted by George Dreger on
In creating a Site Management Policy what are the options for maintenance equipment. Is maintenance equipment a prerequisite or credit?
new building on site with existing buildings - LEED boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Courtney Royal on
Our project is a new construction building and will be constructed on a site that already has 2 other structures.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Tom Martin on
Has the pressure differential requirement of at least 5 pascals for LEED v2009 IEQc5 Indoor and Chemical Source Pollutant Control been eliminated from the requirement of this credit?
electric transformer
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the building there is an electric transformer that transforms the electricity coming from the grid into low voltage energy. The transformer is particularly efficient.
V4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning - implementationposted by Meier Corporate Account on
Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.