Budget Method
NC-v4 EQc2:Low emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Product Specific & Industry EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Leanne Conrad on
Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
BPDO Calculator Error
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michael Wahjudi on
Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.
Engaging the CxA
CI-v4 EAp1:Fundamental commissioning and verificationposted by Jeni Panars on
This pre-requisite requires the CxA be engaged by the design development phase. The client for the project I am working on did not decided to pursue certification until 100% design.
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Tree-Lined Blocks
ND-v4 NPDc14:Tree-lined and shaded streetscapesposted by Martine Desbois on
Hi Elliot, Do pedestrian only or bicycle paths, being part of the circulation network, be included in the calculation for block length under Tree-Lined Blocks. Thanks
Data Center Calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. However, There are some questions in relation
Walkable streets
ND-Plan-v4 NPDp1:Walkable streetsposted by Sarah Kearney on
I have a few questions about this prerequisite: b. How is a block length defined? Is the block length a total for all frontage length of a building or a test for each individual frontage? c.
Material reuse calculation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jen Roberts on
The second example on pg 536 of the reference guide is a bit confusing.