Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Exterior Illuminated Signage
EBOM-v4 MRc2:Purchasing - lampsposted by Mel K on
Hello,
Does this credit apply to Exterior Illuminated Signage?
Thank you
Multi-building project - installing renewables on only 1 building
CS-v4 EAc5:Renewable energy productionposted by Shannon Oletic on
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach).
WEp1_manual watering
NC-v4 WEp1:Outdoor water use reductionposted by Alex Edwards on
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water m
"7% for green vehicles "
NC-v4 LTc8:Green vehiclesposted by Santiago Avila on
"LT Credit Reduced Parking Footprint.
No More Strigent Than
NC-v4 EQp2:Environmental tobacco smoke controlposted by Hannah Fleck on
Hello, I am working on a publicly funded building in the state of Indiana. State law here prohibits smoking within 8 feet of a building.
Peak Shaving Strategies
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model.
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?
NC-v4 SSc2:Site development - protect or restore habitatposted by Kathy Wong on
Hi all,
Concrete Mixes Counting as Separate Products - One EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on
The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition.
Any HAP file that contain both of the proposed building and the baseline
NC-v4 EAp2:Minimum energy performanceposted by Mohamed Abdelrahim Abdelaal on
I’m new in modeling, I have a building need to be simulated for leed rating, Can you please share a "HAP" file that contain both of the proposed building and the baseline for any project as a sampl