Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Site-wide measures

CS-v4 SSc4:Rainwater management
posted by  Mike D  on 

If there are rainwater management measures taking place as part of the masterplan surrounding and including the project building but these are not within the LEED project boundary, can those measur

1
Tue Jan 17, 2017, 8:10 pm

Looking for the best home energy metering system

Homes-v4 EAp2:Energy metering
posted by  Phil Vanderloo  on 

In my research, I seem to be hearing the most about Site Sage by Powerwise as the best available energy metering system out there.

1
Fri Dec 30, 2016, 7:03 pm

Sound Transmission - achievable?

NC-v4 EQc9:Acoustic performance
posted by  Tim Habraken  on 

For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.

1
Wed Feb 4, 2015, 7:59 pm

LEED v4 Reference Guide and EA credits

NC-v4 EAc4:Demand response
posted by  Ivan Romero  on 

The Quick Reference table on page 22 of the LEED v4 Reference Guide indicates "n/a" in all columns except Healthcare for the EA credits Demand Response, Renewable Energy, Enhanced Refrigerant Manag

1
Wed Mar 16, 2016, 8:01 pm

Alternative Compliance Path - C&S LEED Threshold reduction

CS-v4 EAp2:Minimum energy performance
posted by  MKK LEED  on 

Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?

1
Wed May 24, 2017, 4:58 pm

Infill Site

ND-Plan-v4 SLLp1:Smart location
posted by  Jos Schild  on 

Is there a definition of an 'infill site'?

1
Mon Jul 18, 2016, 3:36 pm

Visitors for residential units

NC-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

Hello, Where can I find info on regular and peak visitors for residentual units? App 2 does not give any information on residentual units.

1
Mon Nov 28, 2016, 7:55 pm

Option 1 Path 2 – monitoring-based Cx – how far to go?

Schools-NC-v4 EAc1:Enhanced commissioning
posted by  Tom Kennedy  on 

My customer will build a new K-12 school building using LEED V4. We are in the planning stages and they have expressed interest in monitoring-based Cx.

1
Mon Jan 16, 2017, 5:40 pm

Awarded the credit?

NC-v4 EQc2:Low emitting materials
posted by  Heather Walters  on 

If you have submitted this credit please post if it was awarded or not. If you abandoned the credit at some point in the process when and why? Thanks.

1
Fri Aug 19, 2016, 2:55 pm

Thermal Barrier Tape and EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Jennifer Webb  on 

I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.

1
Wed Jul 27, 2016, 5:46 pm