Forum quick links
Site-wide measures
CS-v4 SSc4:Rainwater managementposted by Mike D on
If there are rainwater management measures taking place as part of the masterplan surrounding and including the project building but these are not within the LEED project boundary, can those measur
Looking for the best home energy metering system
Homes-v4 EAp2:Energy meteringposted by Phil Vanderloo on
In my research, I seem to be hearing the most about Site Sage by Powerwise as the best available energy metering system out there.
Sound Transmission - achievable?
NC-v4 EQc9:Acoustic performanceposted by Tim Habraken on
For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.
LEED v4 Reference Guide and EA credits
NC-v4 EAc4:Demand responseposted by Ivan Romero on
The Quick Reference table on page 22 of the LEED v4 Reference Guide indicates "n/a" in all columns except Healthcare for the EA credits Demand Response, Renewable Energy, Enhanced Refrigerant Manag
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
Visitors for residential units
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Hello, Where can I find info on regular and peak visitors for residentual units? App 2 does not give any information on residentual units.
Option 1 Path 2 – monitoring-based Cx – how far to go?
Schools-NC-v4 EAc1:Enhanced commissioningposted by Tom Kennedy on
My customer will build a new K-12 school building using LEED V4. We are in the planning stages and they have expressed interest in monitoring-based Cx.
Awarded the credit?
NC-v4 EQc2:Low emitting materialsposted by Heather Walters on
If you have submitted this credit please post if it was awarded or not. If you abandoned the credit at some point in the process when and why? Thanks.
Thermal Barrier Tape and EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Webb on
I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.