Switching between Options 1 and 2

CI-v4 EAc2:Optimize energy performance
posted by  Meike Borchers  on 

We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.

0

v4 EAp2 Energy savings by cost or units of energy?

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Tyra Sorensen  on 

Is this still based on cost or is this now based on actual energy savings?

1
Wed Oct 8, 2014, 1:00 pm

n/a

NC-v4 SSc6:Light pollution reduction
posted by  Heather Holdridge  on 

If I understand the LEED requirements for exterior lighting, we will be following the BUG guidelines for all lighting that will remain on from sunset to sunrise.

0

Circulation space around the building core

CS-v4 EQc4:Daylight
posted by  Julien Richard  on 

For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.

0

Water Pressure to Fixtures

CS-v4 WEp2:Indoor water use reduction
posted by  Ciaran McCabe  on 

Is it an absolute requirement that the proposed pressure (in PSI) matches the baseline. Can we use a flow rate at a lower pressure to avoid excessive pump sizes ?

1
Sat Aug 26, 2017, 5:40 pm

Documentation DIBt AgBB - Wet applied product

NC-v4 EQc2:Low emitting materials
posted by  Charline SEYTIER  on 

I have two support documents to justify the compliance of a wet applied product: - A sealed and signed DIBt notification confirming that the product is in accordance with the "Principles for the h

1
Mon May 9, 2016, 7:03 pm

LEED Group C&S - Applicable Cooling source in Propose case

CS-v4 EAp2:Minimum energy performance
posted by  Ashraf Ali Khan Khan  on 

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

1
Fri Jun 9, 2017, 1:06 pm

Indoor recreational facility

ND-Plan-v4 NPDc10:Access to recreation facilities
posted by  Sarah Kearney  on 

Hello, Would an indoor gym that's at least 25,000 square feet and available to anyone (non members can pay for a day pass) be acceptable?

1
Wed Nov 16, 2016, 10:16 pm

Rating System Path

ND-v4 MPR2:Must use reasonable LEED boundaries
posted by  Philippa Cameron  on 

Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.

1
Thu May 28, 2015, 6:37 pm

Construction waste diversion from the site

CI-v4 MRc6:Construction and demolition waste management
posted by  Tracy Backus  on 

How would packaging, for furniture, be included in this conversation?

1
Mon May 8, 2017, 5:39 pm