Switching between Options 1 and 2
CI-v4 EAc2:Optimize energy performanceposted by Meike Borchers on
We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.
v4 EAp2 Energy savings by cost or units of energy?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Tyra Sorensen on
Is this still based on cost or is this now based on actual energy savings?
n/a
NC-v4 SSc6:Light pollution reductionposted by Heather Holdridge on
If I understand the LEED requirements for exterior lighting, we will be following the BUG guidelines for all lighting that will remain on from sunset to sunrise.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
Water Pressure to Fixtures
CS-v4 WEp2:Indoor water use reductionposted by Ciaran McCabe on
Is it an absolute requirement that the proposed pressure (in PSI) matches the baseline. Can we use a flow rate at a lower pressure to avoid excessive pump sizes ?
Documentation DIBt AgBB - Wet applied product
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
I have two support documents to justify the compliance of a wet applied product: - A sealed and signed DIBt notification confirming that the product is in accordance with the "Principles for the h
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Indoor recreational facility
ND-Plan-v4 NPDc10:Access to recreation facilitiesposted by Sarah Kearney on
Hello, Would an indoor gym that's at least 25,000 square feet and available to anyone (non members can pay for a day pass) be acceptable?
Rating System Path
ND-v4 MPR2:Must use reasonable LEED boundariesposted by Philippa Cameron on
Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.
Construction waste diversion from the site
CI-v4 MRc6:Construction and demolition waste managementposted by Tracy Backus on
How would packaging, for furniture, be included in this conversation?