Forum quick links
AGi32 -b sDA
NC-v4 EQc7:Daylightposted by SAMY Chamy on
Dear All:- Is it possible to do sDA (spatial Daylight autonomy) & Annual Sunlight Exposure in AGi32 please clarify what is a difference between Daylight analysis & Spatial daylight auton
Fire Suppression water count as a candidate for Submetering?
CS-v4 WEc4:Water meteringposted by Jennifer Turchin on
Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?
Sustainable Site Prereq 2.1 Site Assessment NCv4 SSc1
Hospitality-NC-v4 SSc1:Site assessmentposted by Tyra Sorensen on
Where can I find this resource? Sustainable Sites Initiative: Guidelines and Performance Benchmarks 2009 I've only been able to find it in the digital archive one page at a time.
Entering nonregularrly occuoied spaces in IEQp1 calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
Certification Process for a Green Cleaning Product
EBOM-v4 EQp3:Green cleaning policyposted by Franklin Raines on
What is the certification or approval process for Green Cleaning Products compliant as part of a LEED-EBOM program?
EPDs used in CS project, can be accounted for in CI project?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Sara Johansson on
If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification?
Logistic Warehouse
NC-v4 EQc7:Daylightposted by Helena Garcia on
Our project is a logistic warehouse which is divided into two buildings.
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix