Regional Priority credits worldwide
NC-v4 RPc1:Regional priorityposted by Pooja Sannamni on
For LEED V4 NC: Are regional priority credits available for any location around the world?
Minimum building energy performance
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by sam Alfassy on
based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.
Existing Equipment
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The 90.1-2010 User's Manual states: "In some cases, a complete HVAC system already exists (...) the proposed building and baseline building models are the same and are based on the existing HVAC sy
Refrigerant Atmospheric Impact
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as
Heat Island Reduction when adjacent to existing building on lot
CS-v4 SSc5:Heat island reductionposted by Nadia Bini on
Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?
compliance for naturally ventilated spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Poorva Keskar on
Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.
Modeling Assumptions for Cold, Dark Shells
CS-v4 EAp2:Minimum energy performanceposted by Michelle Rosenberger on
Hi Marcus, For previous warehouse CS projects with little to no installed mechanical and electrical systems (typically freeze protection, a few ventilation fans, and exterior lighting) we have assu
Less than 100 regular occupants
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
According to Table 5 (Reference Guide, p. 49) for 100 regular building occupants the sample size needs to be 81.
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Mélanie Pitre on
Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!