Forum quick links
Carpool Requirement
NC-v4 LTc7:Reduced parking footprintposted by Sarah Nugent on
Hi There, We're working on a high rise condo in Manhattan that is providing very limited parking (18 spaces for 330 residents).
V4 District Thermal Energy
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Holmes on
What guidelines should be used for district thermal energy systems in v4 when using option 1, specifically combined heat and power systems?
UE Ecolabel
CI-v4 EQc2:Low emitting materialsposted by Gabriela Mena on
Is a EU Ecolabel Certificate an USGBC approved program? Kind regards
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
recycling of existing floors or installation waste
EBOM-v4 MRc5:Solid waste management - facility maintenance and renovationsposted by Diane Martel on
I tried to find language and have not found any. what are the parameters on waste management?
Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Reduced truck idling
NC-v4 LTc8:Green vehiclesposted by Julia Otero on
In a warehouse to pursue option 2, which characteristics must have external connectors in terms of power and position acording to the loading docks? Thanks!
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
Retail project
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
Should customers of a large retail building selling large items (and hence requiring customers to arrive by car and carry items purchased) be included in the calculations? Thanks!