Baseline ratios
CI-v4 LTc5:Reduced parking footprintposted by Susan Di Giulio on
Is there guidance anywhere as to how to interpret the Institute of Parking Engineers tables? There are many columns, but none say exactly "baseline ratio". Or what it is a ratio of.
Calculation grid for option 2
NC-v4 EQc7:Daylightposted by Sarah Leenknegt on
Hi, Regarding option 1, there are clear requirements to the calculation grid and evaluation plane. Do the same requirements apply for option 2? Thanks! Sarah
Multi-use project
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by Vanessa Toralti on
We have a new LEED v4 Multifamily Midrise project (Homes), it’s several residential buildings on the same site.
Exterior Waterproofing Product, foundations and footings
Healthcare-v4 EQc2:Low emitting materialsposted by LEED Pro Consultant on
Do waterproofing products applied to foundations and/or footings require to comply with VOC thresholds and general emissions evaluation?
MRpc102-Legal Wood
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kristopher Croghan on
So in doing some research, are the following certifications acceptable for the legal wood pilot credit?
Number of Bus Routes Required
NC-v4 LTc5:Access to quality transitposted by Carolyn Risley on
To confirm, is it possible to achieve LTc5 with just one bus route so long as the minimum number of weekday/weekend trips are satisfied?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Qualifications for ID+C rating system
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Mercedes Ferreira on
Does the project building need to be a rented space in order for it to fall under the ID+C rating system?
Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
energy used on-site vs sold energy
NC-v4 EAc5:Renewable energy productionposted by LEEDme Lorenzi on
I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.