Forum quick links
62MZ Calculator for v4
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Rasita Masalskyte on
The prerequisite form states that 62MZ Calculator can be used as an alternative to Minimum Air Quality Performance Calculator and it can found under the prerequisite's Resources tab in the Credit L
Concrete Sealant
NC-v4 EQc2:Low emitting materialsposted by Michelle DiPenti on
I'm having difficulty finding a concrete sealant that is in compliance with CDPH Standard Method. Can anyone recommend a concrete sealant that is in compliance with both CDPH Standard Method and th
Trucks
NC-v4 LTc7:Reduced parking footprintposted by Tarek on
In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?
Baseline Economizers
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Standard ASHRAE 90.1-2010 states that Outdoor air exonomizers shall be included in baseline HVAC systems 3 trhough 8, with the exception 6.5.1d: Systems that include a condenser heat recovery syste
Water lilies
NC-v4 SSc3:Open spaceposted by Katherine Ann Resurreccion on
Hi, The project will have water features and water lilies on it. Can somebody confirm that we can measure the whole water feature area to contribute as vegetated space?
Site Management-Organic Waste Management
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Manufacturing projects need to consider organic waste management?
Air Barrier Testing- Commercial
EBOM-v4 EAp2:Minimum energy performanceposted by Justin Tyrrell on
Hi, I work for a company that currently does thermal bypass inspections and air barrier testing on single family and multifamily new construction projects.
Precertification of EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Charalampos Giannikopoulos on
The International EPD System includes the possibility for pre-certification of EPDs as a step in the process to develop Product Category Rules (PCRs).
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?